Feed Mixer Scale: How the Weighing System Works and What to Specify
A total mixed ration is a formulation, and a formulation is only as real as the scale that measured it. If your weighing system reads three percent light on silage and cannot resolve a twenty kilogram mineral addition at all, then the ration your cows eat is not the ration your nutritionist designed, and no amount of mixing time will fix that. The weighing system is also the component most farms understand least, which is why it is often the first thing to stop being trusted and the last thing to be properly diagnosed. This article covers how it works, the one specification that decides whether your ration is accurate, how to calibrate it, and the faults that look like a broken load cell but are not.
What the System Is Made Of
A feed mixer scale has three parts and almost every fault sits in the connections between them. The load cells carry the weight, the junction box combines their signals, and the indicator turns that signal into a number you can read. Most mixers use three or four load cells mounted between the tub or body and the chassis, so that the entire weight of the machine and its contents passes through them on its way to the ground.
A load cell is a precisely machined piece of steel with strain gauges bonded to it. When load is applied the steel deflects by a tiny amount, the gauges change electrical resistance as they stretch or compress, and the resulting signal is proportional to the weight. The output is very small, measured in millivolts per volt of excitation, which is why cable condition and connection quality matter so much more on a weighing system than on anything else electrical on the machine. A corroded terminal that would be harmless in a lighting circuit will produce nonsense weights here.
Four cells rather than one is not redundancy. Mixers load unevenly, with material piled toward one side as the loader works, and four cells spread across the frame sum those uneven loads into a correct total. It also means a single failed cell does not simply remove a quarter of the reading, it corrupts the whole number in a way that is hard to spot, since the machine still appears to weigh something plausible.
The Specification That Decides Ration Accuracy
If you read one thing in this article, read this. A weighing system’s precision is tied to its full scale capacity, not to the size of the thing you are weighing. A system built for a twelve tonne machine might display in five kilogram increments, which is perfectly reasonable for loading silage and completely useless for adding twenty kilograms of mineral. You are being asked to measure a small ingredient with an instrument scaled for a large one.
This is the arithmetic behind a problem many farms experience without diagnosing. The expensive ingredients in a cattle ration are the small ones: minerals, trace elements, protein concentrate, additives, buffers. Those are exactly the ingredients where a fixed display increment represents the largest proportional error.
| Ingredient added | Target weight | Error from a 5 kg increment | Practical consequence |
|---|---|---|---|
| Grass or maize silage | 3,000 kg | under 0.2 percent | Irrelevant |
| Concentrate | 600 kg | about 0.8 percent | Acceptable |
| Protein meal | 150 kg | about 3 percent | Starting to matter on cost |
| Mineral premix | 20 kg | up to 25 percent | Formulation no longer reliable |
| Additive or buffer | 5 kg | up to 100 percent | Cannot be weighed on this system at all |
There are three honest answers to this and none of them is a better load cell. Pre weigh micro ingredients off the machine on a small platform scale and tip in a known bag. Have your supplier blend the micro ingredients into a premix large enough for the mixer to resolve. Or specify an indicator with a finer increment at the order stage, accepting that resolution and capacity pull against each other. What does not work is trusting a coarse display with a small ingredient and assuming the formulation survived.
When a customer tells me the scale is broken, the first question I ask is what increment the display shows and what they were trying to weigh. More than half the time the system is working exactly as designed and it was never capable of measuring a twenty kilogram mineral addition. That is a specification problem from the day of purchase, not a fault, and it is why we ask about your ration before quoting an indicator. Sue Su, Marketing Director, Tsingtao Jummos Agricultural Technology Co., Ltd.
Load Shunting: The Fault That Is Not a Fault
The most common cause of a mixer weighing wrongly is not a failed component. It is that some of the load is bypassing the cells instead of passing through them. A weighing system only reads correctly if the tub is free to press down on the load cells and nothing else is carrying part of that weight, and plenty of things on a working farm machine quietly start doing exactly that.
The usual culprits are a hydraulic hose that has stiffened and now acts as a strut between tub and frame, a safety chain or tie that has been shortened or tangled, feed residue packed solid into the gap between tub and chassis, a bolt or bracket that was added for an unrelated repair, ice in winter, and a transport lock or mechanical stop that was engaged and never released. Each of these takes a share of the load to the ground without going through a cell, and the indicator cannot know. It reports what it feels, which is less than the truth.
The diagnostic is simple and costs nothing. With the machine empty and on level ground, look along the entire gap between the weighed part and the chassis and check that nothing crosses it except the load cells themselves and the cables. Clear out compacted residue. Flex the hoses by hand to confirm they are not under tension. Then zero the scale and see whether it holds. If a system reads correctly when empty but under reads when loaded, shunting and a single failed cell are the two things to look at, in that order.
Calibrating the System
Calibration has two parts: zero, which tells the system what empty means, and span, which tells it how much a known weight is. Checking zero takes a minute and should happen daily. Checking span takes longer and is worth doing monthly, with a full calibration annually and after any mechanical work on the frame, the cells or their mountings.
- Park on level, firm ground, and use the same spot every time. Consistency removes a variable, and some installations read differently on a slope.
- Empty and clean the tub. Residue is weight, and a tub with two hundred kilograms of caked feed in it will never zero honestly.
- Check for shunting using the walk around above. There is no point calibrating a system that has load bypassing it, because you will simply calibrate the error in.
- Zero the system. Follow the indicator’s procedure rather than pressing buttons hopefully.
- Load a known weight. Certified test weights are ideal. Drums of water are a good practical substitute, since water is one kilogram per litre, so a full two hundred litre drum is close to two hundred kilograms. Several drums give you a usable reference figure.
- Set the span to match. The indicator now knows the relationship between signal and weight.
- Verify at a second, larger weight. A system can be correct at one point and wrong at another, and checking two points is what catches that.
- Write down the date and the result. A calibration log turns a vague suspicion that the scale is drifting into evidence.
One habit worth adopting: take your readings the same way every time, either always with the auger stopped or always with it turning. A load in motion produces a fluctuating signal that the indicator smooths out, and the smoothed figure is not identical to the static one. Consistency matters more than which you choose.
Faults by Symptom
Weighing faults feel mysterious because the component is invisible and the output is a number. In practice they fall into a short list, and the cheap causes are far more common than the expensive ones.
| Symptom | Check in this order |
|---|---|
| Will not return to zero when empty | Feed residue in the tub, then residue packed between tub and frame, then load shunting, then a failed cell |
| Numbers jump erratically | Cable damage and loose or corroded connections, then moisture in the junction box. Erratic behaviour points to a connection; a failing cell usually drifts steadily instead |
| Correct empty, wrong when loaded | Load shunting, then one failed or bound cell, then calibration span |
| Consistently reads light or heavy by a similar proportion | Span calibration, then whether the reference weight used last time was actually accurate |
| Reading changes when the machine is moved or on a slope | Mounting and installation, then whether a transport lock is engaged |
| Display blank or no response | Power supply, fuse, the main cable run, then the indicator itself |
| Worked last season, dead this season | Rodent damage to cables, which is the classic failure over a quiet period, then moisture ingress |
Protecting the System
Load cells rarely die of old age. They die of water, impact, rodents and welding, in roughly that order, and all four are preventable.
- Keep pressurised water away from cells, the junction box, connectors and the indicator. Rinsing the tub is good practice. A pressure lance aimed at a cable gland will push water past a seal that handles rain perfectly well, and once water is in the junction box the readings go strange before anything fails outright.
- Route and protect cables away from loader paths. Most physical load cell damage on farms is a bucket or a fork, not the machine’s own operation.
- Treat rodents as an expected threat rather than bad luck. Cable in conduit, blocked entry points and baiting around the machine’s winter parking spot cost very little compared with a replacement cell and a call out.
- Never weld on the machine with the system connected. This one destroys load cells regularly and is the least known of the four. Welding current will take the shortest path to the earth clamp, and if that path runs through a load cell the strain gauges are finished. Disconnect the indicator and the cells, and clamp the earth lead as close to the weld as possible.
- Do not lift or jack the machine through the weighed structure unless the manual says you may. Lifting in the wrong place puts the whole weight through one cell in a direction it was not designed for.
The washing principle here is the same one that governs the rest of the machine, and the maintenance schedule it belongs in is set out in our article on feed mixer maintenance.
Specifying or Retrofitting a System
Most mixers can be fitted with a weighing system afterwards, and retrofits succeed or fail on the mounting rather than the electronics. Cells have to be installed so that the weighed structure is free to move vertically by the small amount they need, and so that nothing else bridges the gap. A retrofit that bolts cells in rigidly, or that leaves a hose or bracket carrying load, produces a system which reads something consistent and wrong, which is worse than no scale at all because you will believe it.
What to put in writing before you order, whether the system is factory fitted or added later:
- Number of load cells, their type and brand, and their individual capacity rating with headroom above your maximum loaded weight.
- Display increment, which is the specification that decides whether your smallest ingredient can be weighed at all. Ask for it in kilograms, not as a percentage.
- Ingress protection rating on cells, junction box and indicator. Washdown environments need a rating meant for it.
- Cable routing and protection, including whether conduit is fitted as standard.
- Junction box sealing and whether it includes a desiccant or breather arrangement.
- Indicator features you will actually use: stored recipes, ingredient by ingredient prompting, a running total, data export, and a display readable in direct sunlight.
- Whether a remote display is available for the loader operator, which removes a great deal of climbing down to look.
- Mechanical overload stops, which protect cells from shock loading.
- Calibration procedure documentation, and whether the supplier will walk you through the first calibration.
- Spare part availability and price for a single load cell and the indicator, supplied as a list before you order.
That last point separates suppliers reliably. A company that stocks weighing parts can send the list within a day. For the wider framework on checking out a supplier before paying, see our article on TMR mixer companies, and for how the weighing system fits alongside the other components see feed mixer specifications.
Why It Pays For Itself
The case for taking weighing seriously is a cost case rather than a precision one. Feed is the largest single expense in most cattle operations, and a scale that reads three percent heavy means you are feeding three percent less than you think and losing performance, while one that reads three percent light means you are feeding more than you need and paying for it every day of the year. Neither error announces itself, because both produce a confident number on a display.
The second benefit is diagnostic. Accurate ingredient by ingredient weights let you compare what you intended to feed with what the animals actually received, which makes it possible to work out whether a drop in yield came from the ration, the forage quality or something else entirely. Without reliable weights every nutritional conversation starts with an argument about what was in the mixer. Our guidance on feed mixer capacity covers the related question of how much the machine should be loading in the first place.
Jummos manufactures TMR mixers at No.173 Jufeng Road, Qingdao, China, in vertical and horizontal, single and multiple auger, stationary and trailed configurations, alongside balers, bale wrappers and manure handling equipment. Machines carry a twelve month warranty. Tell us the smallest ingredient you need to weigh and we will tell you honestly whether the standard indicator on a given model can resolve it or whether you should pre weigh that ingredient off the machine. That is a more useful answer than a headline accuracy figure.
Frequently Asked Questions
Why does my feed mixer scale not weigh small ingredients accurately?
Because the display increment is tied to the system’s full capacity rather than to what you are weighing. A system built for twelve tonnes might read in five kilogram steps, which is fine for silage and hopeless for a twenty kilogram mineral addition. The fixes are to pre weigh micro ingredients on a small platform scale, have them blended into a larger premix, or specify a finer increment when ordering.
How often should I calibrate a feed mixer scale?
Check zero daily with the tub empty, verify against a known weight monthly, and do a full calibration annually and after any mechanical work on the frame, the cells or their mountings. Drums of water make a cheap and reasonably accurate reference, since water weighs one kilogram per litre. Keep a dated log, because that is what turns a suspicion of drift into something you can act on.
My scale reads fine empty but seems wrong when loaded. What is it?
Most likely load shunting, meaning part of the weight is reaching the ground without passing through the load cells. Look along the gap between the weighed structure and the chassis for anything bridging it: compacted feed residue, a stiffened hydraulic hose acting as a strut, a tangled chain, an added bracket, or an engaged transport lock. If the gap is genuinely clear, the next suspects are a single failed or bound cell and the span calibration.
Can a weighing system be fitted to a mixer that does not have one?
Usually yes, and the electronics are the easy part. Success depends on mounting the cells so the weighed structure can move the small amount they require, with nothing else carrying load across the gap. A rigid or obstructed installation gives readings that are consistent and wrong, which is more dangerous than having no scale, since you will trust the number.
What is the most common cause of load cell failure?
Water, impact, rodents and welding. Water usually arrives via a pressure washer aimed at a cable gland or junction box. Impact is typically a loader bucket catching a cable. Rodents chew cables during quiet months, which is why systems often work at the end of one season and are dead at the start of the next. And welding on the machine with the system connected sends current through the strain gauges and destroys them, so always disconnect the cells and the indicator first.
Reviewed by Sue Su, Marketing Director at Tsingtao Jummos Agricultural Technology Co., Ltd., a manufacturer of TMR mixers, balers, bale wrappers and manure handling equipment based in Qingdao, China. Last reviewed 5 November 2026.